Skip to content
Angie Energy
A 25 MW mobile gas turbine unit and its control trailer at a data center site, at sunset

Plug-and-play gas turbine power

Power in 7 days.

25 MW ISO per unit, producing within 7 days once your site is ready and the equipment is on site. Add units to scale. Lease or PPA.

The problem

The grid can’t deliver power fast enough.

New grid connections can take years. Data centers and AI, growing cities and heavy industry need power now. Install your own behind-the-meter power plant.

The solution

Plug and play.

Each unit is a 25 MW ISO aeroderivative gas turbine package on two trailers. No foundation, no concrete pad: position the trailers, connect fuel and cables, power on. Add units as your load grows.

Close view of a 25 MW mobile gas turbine unit: filter house, exhaust stack and access stairs

25MWISO1

Per unit. Add units to scale.

7days

To power, once the site is ready and the equipment is on site.

50 / 60Hz

Built for 50 Hz and 60 Hz grids.

Dualfuel

Natural gas or liquid fuel.

0foundations

No concrete pad. Minimal site preparation.

2trailers

Generator on one. Controls on the other.

1 ISO rating. Output varies with frequency, ambient temperature and pressure.

Who we power

For projects that can’t wait.

How it works

Ready site to power in 7 days.

  1. 01

    Site ready

    A level, compacted pad, a fuel supply and a connection point. No foundation or concrete pad.

  2. 02

    Deploy

    Two trailers arrive, are positioned, and fuel and cables are connected.

  3. 03

    Power on

    25 MW ISO per unit. Add units as demand grows.

Lease or PPA

Your terms.

Flexible terms for temporary or permanent power.

Lease
Bridging power until your grid connection is live, on flexible terms.
PPA
A full range of services, including fuel sourcing, management and guaranteed kW output. Temporary or permanent power.

How much power do you need, and where?

Tell us about your site. We’ll tell you how fast we can power it.